Property data
Sale history
£875,000 on Sep 2013
Bedrooms
na
Type
Semi-detached
Council tax band
na
Planning
January 2016

Type:
Heritage application - conservation issues and listed buildings
Status:
Application withdrawn before a decision was taken
Address:
316 Brixton Road Londo
Description:
Replacement of bathrooms with the installation of plumbing and radiators at the basement level
January 2016

Type:
Full and householder planning application
Status:
Application withdrawn before a decision was taken
Address:
316 Brixton Road Londo
Description:
Replacement of windows at basement level and the construction of a bridge walkway and railings to rear. an extension of the basement lightwell to rear together with the construction of an external staircase in basement lightwell
September 2014

Type:
Discharge of conditions imposed on an existing application
Status:
Status not known
Address:
316 Brixton Road Londo
Description:
Approval of details pursuant to condition 4 (details of fenestration and doors) of planning permission ref:- 13/04676/LB (Replacement of all fenestration with single glazed sash windows and a glazed door; installation of new central heating and hotwater system including extension of an existing single storey side extension and installation of new SVP's to side elevation; repair damaged ceiling to rear reception room, enlarge opening between front and rear reception rooms, repair and reinstate window shutters. New plumbing installation and radiators to all rooms, new opening from rear bathroom to bedroom and installation of bathrooms at first and second floor level (front). Replacement of doors in the side gate.) granted on 23.12.2013.
December 2013

Type:
Heritage application - conservation issues and listed buildings
Status:
Status not known
Address:
316 Brixton Road Londo
Description:
Replacement of all fenestration with single glazed sash windows and a glazed door; installation of new central heating and hotwater system including extension of an existing single storey side extension and installation of new SVP's to side elevation; repair damaged ceiling to rear reception room, enlarge opening between front and rear reception rooms, repair and reinstate window shutters. New plumbing installation and radiators to all rooms, new opening from rear bathroom to bedroom and installation of bathrooms at first and second floor level (front). Replacement of doors in the side gate.