1, Back Field, BD13 3EX
Property data
- Sale history
-
Price Date Annual growth After inflation £82,500 Mar 2010 5.1% 2.7% £59,950 Sep 2003 8.4% 6.7% £35,000 Jan 1997 na na - Bedrooms
- 2
- Type
- Semi-detached
- Council tax band
- A
- Plot size
- 58 square metres (624 square feet) - map showing freehold boundary lines
Archived listings
- History:
- Archived sales listing for 1 Back Field. Advertised on multiple portals. It was added on 23/05/2014. It last appeared Dec 2014.
- Photos:
-
There are 15 historic photos of 1 Back Field.
- Advertiser remarks:
-
- 2 bedrooms
- 1 bathrooms
Planning applications
- Planning ref:
- July 2024 24/01846/LBC
- Type:
- Heritage application - conservation issues and listed buildings
- Status:
- Status not known
- Address:
- 1 Back Field Thornton Bradford West Yorkshire
- Description:
- Rebuild garden boundary wall
- Planning ref:
- June 2021 21/00232/LBC
- Type:
- Heritage application - conservation issues and listed buildings
- Status:
- Status not known
- Address:
- 1 Back Field Thornton Bradford West Yorkshire
- Description:
- Internal fit out of fifth floor offices.
- Planning ref:
- November 2019 19/04504/CLL
- Type:
- Heritage application - conservation issues and listed buildings
- Status:
- Status not known
- Address:
- 1 Back Field Thornton Bradford West Yorkshire
- Description:
- Re-pointing front, side and rear elevations An outline of the works that I wish to have carried out are detailed below:- - The elevations will be raked out using 110v angle grinders. The existing mortar will be raked back to a depth of 15mm to obtain a good key for the new pointing mix. - Each elevation will be washed down to dispose of any dust and loose debris within the mortar joints. - The elevations will be re-pointed using a mix ratio of 5:1:1 NHL lime to gain maximum strength, while providing flexibility and breathe-ability to the external masonry. All new pointing will be compressed and soft brush finish to obtain a new, impressive first impression view and great kerb appeal, with uniformity throughout the external structure. MATERIALS USED - Transformer, sand, NHL 3.5 lime, hand tools, grinder, mixer, drills, hand tools. SBR, tower scaffolding,