Property data
Sale history
Price Date Annual growth After inflation
£82,500 Mar 2010 5.1% 2.7%
£59,950 Sep 2003 8.4% 6.7%
£35,000 Jan 1997 na na
Bedrooms
2
Type
Semi-detached
Council tax band
A
Plot size
58 square metres (624 square feet) - map showing freehold boundary lines
Archived listings
History:
Archived sales listing for 1 Back Field. Advertised on multiple portals. It was added on 23/05/2014. It last appeared Dec 2014.
Photos:

There are 15 historic photos of 1 Back Field.

Photos for 1 Back Field
View photos
Advertiser remarks:
  • 2 bedrooms
  • 1 bathrooms
Planning applications
Planning ref:
July 2024 24/01846/LBC
Type:
Heritage application - conservation issues and listed buildings
Status:
Status not known
Address:
1 Back Field Thornton Bradford West Yorkshire
Description:
Rebuild garden boundary wall

Planning ref:
June 2021 21/00232/LBC
Type:
Heritage application - conservation issues and listed buildings
Status:
Status not known
Address:
1 Back Field Thornton Bradford West Yorkshire
Description:
Internal fit out of fifth floor offices.

Planning ref:
November 2019 19/04504/CLL
Type:
Heritage application - conservation issues and listed buildings
Status:
Status not known
Address:
1 Back Field Thornton Bradford West Yorkshire
Description:
Re-pointing front, side and rear elevations An outline of the works that I wish to have carried out are detailed below:- - The elevations will be raked out using 110v angle grinders. The existing mortar will be raked back to a depth of 15mm to obtain a good key for the new pointing mix. - Each elevation will be washed down to dispose of any dust and loose debris within the mortar joints. - The elevations will be re-pointed using a mix ratio of 5:1:1 NHL lime to gain maximum strength, while providing flexibility and breathe-ability to the external masonry. All new pointing will be compressed and soft brush finish to obtain a new, impressive first impression view and great kerb appeal, with uniformity throughout the external structure. MATERIALS USED - Transformer, sand, NHL 3.5 lime, hand tools, grinder, mixer, drills, hand tools. SBR, tower scaffolding,