70, Carr Road, LS28 5RH
70 Carr Road is a detached home in Farsley. It sold for £950,000 in May 2017. The Land Registry and EPC data was last updated 1 June 2026.
Property data
- Sale history
-
£950,000 on May 2017 (est. today's value: £1,272,699)
- Floor plan
-
Archived estate agent floor plan for 70, Carr Road.
- Bedrooms
- 8
- Type
- Detached
- Council tax band
- G
- Plot size
- 3,071 square metres (33,056 square feet) - map showing freehold boundary lines
Archived listings
Planning applications
- Planning ref:
- September 2022 22/02613/TR
- Type:
- Tree and hedge works
- Status:
- Application refused
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- G1 - 3x Yew on banking with previous poor pruning leaving unsightly trees, remove. Cherry at top of embankment with extensive decay at base and previous failed limbs, remove.T11 Cherry - Draw back from over lawn area by 2-3m.T12 Copper Beech - Draw back from over lawn area by 2-3m.T14 Horse Chestnut - Draw back from over lawn area by 2-3m.T16 Kretschmaria deusta present on main stem. Reduce entire canopy by approx. 4m. Current Height and spread 25mx17m, retained 20mx14m.
- Planning ref:
- June 2022 21/10029/TR
- Type:
- Tree and hedge works
- Status:
- The application is no longer active but no decision was made. Perhaps a split decision
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- Sycamore (T20, T21) - fell. Horse Chestnut (T19) - fell The felled trees to be replaced by a mix of Acer Japonicum an ornamental cherry
- Planning ref:
- December 2021 21/08909/COND
- Type:
- Discharge of conditions imposed on an existing application
- Status:
- Application approved
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- Consent, agreement or approval required by condition 4 of Planning Application 20/03608/FU
- Planning ref:
- December 2021 21/09012/COND
- Type:
- Discharge of conditions imposed on an existing application
- Status:
- Application approved
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- Consent, agreement or approval required by condition 4 of Planning Application 20/03609/LI
- Planning ref:
- July 2021 21/05596/COND
- Type:
- Discharge of conditions imposed on an existing application
- Status:
- Application approved
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- Consent agreement or approval required by conditions 5, 6, 7 and 8 of Planning Application 20/03608/FU
- Planning ref:
- July 2021 21/05598/COND
- Type:
- Discharge of conditions imposed on an existing application
- Status:
- Application approved
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- Consent, agreement or approval required by conditions 5 and 6 of Planning Application 20/03609/LI
- Planning ref:
- July 2020 20/03608/FU
- Type:
- Full and householder planning application
- Status:
- Decision has yet to be made
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- Replacement detached double garage, orangery, timber gates with fence and alterations to driveway to front; alterations to form new access door from basement level and patio area to rear and replacement windows to east elevation
- Planning ref:
- July 2020 20/03609/LI
- Type:
- Heritage application - conservation issues and listed buildings
- Status:
- Decision has yet to be made
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- Listed Building Application for replacement detached double garage, orangery, timber gates with fence and alterations to driveway to front; alterations to form new access door from basement level and patio area to rear and replacement windows to east elevation
- Planning ref:
- March 2018 18/00537/TR
- Type:
- Tree and hedge works
- Status:
- Application approved
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- T1 Horse Chestnut - Remove lower NE limb. This limb had previously been reduced because of a longitudinal crack close to the attachment point. There is only dead wood now attached to this limb. Draw back crown 2m to suitable growth points. Crown lift to 4.5m (out of leaf). Remove dead wood. T2 Horse Chestnut - Remove lower NE limb. Draw back growth to the North and east by 2m to suitable growth points. Crown lift to 4.5m (out of leaf). Remove the crossing branch at the top of the easterly of the two stems. Remove dead wood T3 Horse Chestnut - Remove. This tree is heavily suppressed by 2 large sycamores that are both within 2 meters of it. The result is that the stem has grown to the east and most of the growth on that tree is also on the east. This is causing excessive shading. The removal of this tree will also allow room for the 2 close by sycamores to develop.T4 Sycamore - No works T5 Sycamore - Remove the bottom two SE growing limbs. Drawback the growth to the SE by 2m to appropriate growth points. Remove dead wood.
- Planning ref:
- March 2017 17/00940/TR
- Type:
- Tree and hedge works
- Status:
- Application approved
- Address:
- 70 Carr Road Calverley Pudsey
- Description:
- See attached application.
Frequently asked questions
According to HM Land Registry price paid data, 70 Carr Road last sold for
£950,000 in
May 2017.
The bedroom count is shown as 8 bedrooms. Bedroom numbers can come from a previous estate agency listing, an EPC record, or an estimate based on the size of the property.
When we last checked, 70 Carr Road was in council tax band G.
Council Tax bands can change, so check the latest
Valuation Office Agency Council Tax list.
70 Carr Road is in postcode LS28 5RH, in Farsley.
You can also view HouseMetric's sold-price page for
Carr Road, LS28 5RH
or
analysis of the Farsley property market.
HouseMetric combines HM Land Registry price paid data, Energy Performance Certificate data and Ordnance Survey/open data.
The data were last updated 1 June 2026. Figures such as indexed values and local valuation ranges are calculated estimates for context, while official records can change as public datasets are updated.
For more detail on HouseMetric data sources, update frequency and valuation methods, see the HouseMetric FAQs.